Lloydminster

QUICK FACTS

Land Holdings516 net sections
Production (Q1/2023)11,900 boe/d
  • Baytex has been producing in the Lloydminster area since 1993
  • Lloydminster asset consists of several geographically dispersed heavy oil operations that include primary and thermal production. In some cases, heavy oil reservoirs are water flooded and polymer flooded
  • Applying multi-lateral horizontal drilling and production techniques
  • Strong capital efficiencies and economics
  • Expect to bring ~30 net wells on production in 2023

BACK TO OPERATING AREAS